Yarsi Hospital
Project introduction:Yarsi Hospital
YARSI Hospital is a hospital in the heart of the Capital City of DKI Jakarta, namely in the Central Jakarta area. This strategic location is an important value for YARSI Hospital to be able to provide health services to the public which are supported by easy access to patients. This hospital is a Class B hospital, which also provides advanced referral health services. In addition, YARSI Hospital is also a hospital prepared as a teaching hospital for prospective doctors in the Faculty of Medicine at YARSI University, which has received accreditation A from the National Accreditation Board for Higher Education - Kemenristekdikti. The hospital consists of 17 floors, which is equipped with a Guess House, Clinical Research Center, and Helipad.This project uses AHU&FCU totally 142 units.
Other Project:AKFA MEDLINE CLINIC,Uzbekistan
Citi Doctor, Ukraine
Project introduction:Citi Doctor, Ukraine
Netherlands embassy is a place where we will apply for a visa when visiting or going on a business trip to the Netherlands.
Other Projects:Mendoza Government House,National Police headquarters,Netherland Embassy
Harbin- sunflower pharmaceutical industry
Project introduction: The "sunflower" trademark is recognized as "well-known trademark in China" by the state. TICA provides several large air volume modular air handling units, fully meet sunflower group's needs and meet the national GMP certification standard. In addition, the low air leakage rate of the unit also greatly reduces the operating cost.
The Centre of LuShang
Project introduction: Lushang center Hengda Real Estate Lingqi Branch is a leading enterprise in Lingqi real estate. It must meet the requirements of temperature, humidity, cleanliness, comfort and so on. Also consider formaldehyde PM2.5 and other issues. TICA clean VRF unit has multi-functional section selection. For office premises, it can meet the high standards of temperature and humidity and cleanliness,fully meet the needs of users.
The Water Cube
Project introduction: The National Aquatics Center is one of main competition venues of 2008 Beijing Olympic Games, as well as one of landmark buildings of 2008 Beijing Olympic Games. After 2008 Beijing Olympic Games, the area of 11,000 temporary seats was removed to build a north-south four-storey functional building, and the ground floor at the west side of the north entrance was reconstructed to a exhibition hall.
ANOR PLAZA SHOPPING CENTER,Uzbekistan
Project introduction:ANOR PLAZA SHOPPING CENTER,Uzbekistan
ANOR PLAZA SHOPPING CENTER area is 11000 ㎡. It uses TICA 250 units Fan Coil Unit and 15 units Modular AHU.
Other Projects:SM City Shopping Mall, Philippines,IMM Mall, Singapore
Haikou-Hainan Airlines International Square
Project introduction:: The tallest building in Hainan is located in the core area of Haikou finance and commerce. The total construction area is about 210 thousand square meters. It includes five star hotels, 5A level office buildings, high-end apartments, shopping centers and high-end leisure clubs.TICA’ modular air handling unit, air handling unit and DC brushless fan coil unit and other unit are used.
Beijing-Wukesong Indoor Stadium
Project introduction:A world leading stadium adopting unique design must meet the requirements for aspects such as temperature,humidity, purification degree and comfort degree, and also needs to take into account of the issues such as the air conditioning load change after the match and energy recovery.
TICA modular AHU has multiple function sections for selection and can meet the high standard requirements for temperature, humidity and purification degree, as well as the air conditioning requirements of large sports occasions completely.
Maldives seaplane airpor
Project introduction:Maldives seaplane airport project.
The project was started in January 2017 after Beijing urban construction group signed a cooperation agreement with the maldives airport company. The project is backed by the maldives villana international airport, with a total construction area of 10,000 square meters. It adopts 3 sets of water-cooled screw flagship filled with liquid, modular air handing unit and fan coil unit, and adopts MODBUS centralized control system.
Wuhan Beibianzu Station
Project introduction:As a modern passenger station, the automobile east station will be the landmark building of a city. Therefore, it is necessary to meet the requirements of passengers, such as temperature and humidity, purity, comfort and so on. It is also necessary to consider the change of air conditioning load with the increase and decrease of air traffic. TICA series products have multi-functional selection, which can not only meet the high standard requirements of temperature, humidity and evolution, but also fully meet the air conditioning requirements of large passenger transport sites.
North Section of Shanghai Rail Transit Line No.11
Zhongda Electronics
EGing Solar PV
FAW Toyota
Shanghai Yangguang Cuizhun Yuan
Chile Pavilion
Wuhan Qintai Grand Theatre
Yunnan Yuxi Cigarette Factory